King Kong Construction (December 5)

I had about 3 minutes of taking pictures before it became the bewitching hour for the camera, but there are a few notable updates:

King Kong Construction Universal Studios Orlando Islands of Adventure

The most notable update is the netting that they placed around the outside of the all-but-confirmed ride path.

King Kong Construction Universal Studios Orlando Islands of AdventureIt extended all the way around the front portion of the site and back to the left side of the queue building. This makes me think that the queue structure we can see will be open to the air at some points.

King Kong Construction Universal Studios Orlando Islands of Adventure

I apologize for the image quality, but you can get the gist of the new netting element through these photos.

King Kong Construction Universal Studios Orlando Islands of Adventure

The rockwork continues to develop around the main building on the right side of the site.

King Kong Construction Universal Studios Orlando Islands of AdventureThe queue paths continue to be more and more refined.

King Kong Construction Universal Studios Orlando Islands of Adventure

I am starting to suspect that this concrete slab might be the home to a whole bunch of lockers, but that is purely conjecture at this point.

Thanks for checking in for a quick update of one of Orlando’s newest attractions. It has been exciting (and informative) to see how this comes to life!